Work Order Scheduler
May 2026
Sun
Mon
Tue
Wed
Thu
Fri
Sat
26
27
28
29
30
1
2
3
4
Chiller AHU-03 inspection
Chiller AHU-03
5
6
Genset weekly test
Genset GS-02
7
Lift L-02 PM
Goods Lift L-02
8
Cooling tower dosing
Cooling Tower CT-01
9
10
11
12
Fire alarm zone 4 reset
Fire Alarm Panel
13
AHU-12 belt replacement
Air Handling Unit AHU-12
CWP-12 pump replacement
Chilled Water Pump CWP-12
14
15
UPS load bank test
UPS UPS-01
MSB-3 breaker swap
Main Switchboard MSB-3
16
17
18
FCU-L18-04 thermostat
Fan Coil Unit FCU-L18-04
19
20
Sump pump SP-2 test
Sump Pump SP-2
21
Reception lighting replacement
Reception Lighting GF
22
CCTV NVR-01 disk swap
NVR-01
23
24
25
26
Roller shutter LB-01 service
Roller Shutter LB-01
27
28
Cooling tower CT-02 dosing
Cooling Tower CT-02
29
MCCB tightening L18
Distribution Panel DP-L18
30
31
1
2
3
4
5
6